Wheelie Bin Lift
BTM/375/2100/B/G
Wheelie Bin Lift Description
This double pillar wheelie bin lift is designed to lift and tip at a discharge height of 2100mm. The wheelie bin lift is constructed from mild steel and has a painted finish. The lifting is accomplished via chains driven by a motor gearbox mounted at the top of the one column with a crossover shaft to the other column. The wheelie bin lift is designed to be bolted to the floor.
Safety Guard to PD 5304:2005 Safety of Machinery
The safety guard is constructed from 40 x 40 x 3mm mild steel box section and 2mm mild steel sheet to meet the requirements of PD 5304:2005 Safety of Machinery. It encloses the wheelie bin lift to a height of 2200mm on two sides, 2000mm at the front with a hinged door on the fourth side. The guard door is electrically and mechanically interlocked preventing the wheelie bin lift from operating with the door open. In addition, the guard door can only be opened when the lifting carriage is at the full down position. The wheelie bin lift control system has provision for a ‘Call for Product’ signal to be connected.
Wheelie Bin Lift Specification
|
DESCRIPTION
|
DOUBLE PILLAR WHEELIE BIN LIFT |
|
MODEL No.
|
BTM/375/2100/B/G |
|
CAPACITY
|
375Kgs
|
|
TIPPING HEIGHT
|
1950mm
|
|
TIPPING ANGLE
|
140 DEGREES
|
|
OVERALL HEIGHT
|
3622mm
|
|
MACHINE HANDING
|
LEFT OR RIGHT HAND AVAILABLE
|
|
TIPPING CHUTE
|
OPTIONAL
|
|
CONTAINER DESCRIPTION
|
MILD STEEL WHEELED CONTAINER |
|
BASE ARRANGEMENT
|
BOLTED TO THE FLOOR
|
|
CONTROL CIRCUIT
|
24Vac (STANDARD)
|
|
ELECTRICAL RATING
|
IP65
|
|
LIMIT SWITCHES
|
ADJUSTABLE ROD |
|
MOTOR DETAIL |
0.75kW, 415V, 3 PHASE, 50 CYCLE |
|
MOTOR BRAKE |
415V SEPARATELY EXCITED |
|
GEARBOX DETAIL |
FLENDER |
|
LOAD CHAIN |
¾" SIMPLEX SEDIS DELTA Z |
|
TENSION CHAIN |
¾” SIMPLEX DELTA Z |
|
LIFT SPEED
|
6.4 METERS/MINUTE |
Wheelie Bin Lift Application Story
This double pillar wheelie bin lift was designed to lift and tip a customer’s unique wheeled container which contained rolls of insulating material. The material was tipped into a shredder and could then be re-worked. The customers requirement was for a mild steel painted machine.
|